SWZ|Maritime’s January 2026 issue: Know how

SWZ|Maritime’s January 2026 issue: Know how

Why design a gearbox when you can simply order one from a catalogue? A perfectly valid question for a student, early on a Monday morning, slumped over a drawing board. Or at least that’s what my classmates and I thought when we were told to design one. I doubt a...

Scale Increase Changes the Logistical Needs of Shippers

Scale Increase Changes the Logistical Needs of Shippers

The increase in scale in project cargo continues unabated. Wind turbines are getting bigger and bigger and there is a clear trend towards modular design. Where is the limit and what are the perspectives? Visit the two-day conference of the Project Cargo Summit on 11 and 12 September to find out.

ROMAS Project Tests Shore-based Engine Control Room

ROMAS Project Tests Shore-based Engine Control Room

Remote operation of onboard machinery offers an array of advantages. Research project ROMAS is exploring the idea of moving the engine control room from the ship to a shore-based centre, while ensuring a similar or even better safety level. Tests have already been carried out with Norwegian ferry the Fannefjord.

Three Innovations Introduced at New Belgian Offshore Wind Farm

Three Innovations Introduced at New Belgian Offshore Wind Farm

Developer Parkwind and marine contractor Jan De Nul Group have begun seabed preparation works for the 219 MW Belgian offshore wind farm Northwester 2. In addition to a new type of wind turbines, the foundations feature a new design of external access platforms. At the same time, Jan De Nul will deploy its custom-built monopile gripper for the first time.


PARTNERS

CEDA

SWZ|Maritime is looking for a Treasurer

Are you financially savvy and do you have an active network in the maritime sector? Then we have a great opportunity for you! Read more...


SWZ|Maritime articles

Curious about the articles in SWZ|Maritime? Some of them are published online. Read them here.