IHC and Naval sign contract for new Dutch submarines
Royal IHC and Naval Group signed an agreement for the supply of key components for the new Orka-class submarines of the Royal Netherlands Navy on 16 June. With this contract, Royal IHC substantially contributes to the strategic defence programme, which provides for...
Aker Kvaerner Signs First Subsea Contract with Repsol YPF
Aker Kvaerner has been awarded its first subsea contract from Spanish oil company Repsol YPF. The deal is for the delivery of a subsea production system to the Montanzo and Lubina projects off the east coast of Spain. This is Aker Kvaerner’s first subsea project in the region. The value of the contract is undisclosed.
Van Oord Completes The World
Dredging and marine contractor Van Oord has completed the prestigious land reclamation project The World in the emirate of Dubai. The World is a group of 300 artificial islands four kilometres off the coast of Dubai that have been shaped in the form of the continents. The project covers a surface area of nine by seven kilometres and was completed in the record time of little more than four years. The islands can now provide the setting for hotels, apartments and villas. This is the next immense project, visible from space.
Heerema Fabrication Group Awarded EPC Project in Offshore Wind Energy Market
Heerema Vlissingen, one of the operating companies of Heerema Fabrication Group (HFG) in Zwijndrecht, the Netherlands, recently signed an EPC contract with ABB in Sweden for the design, procurement and fabrication of a 400 MW transformer offshore platform in the German sector of the North Sea.
Helenic to Be Delivered in the First Week of March
Bijlsma Shipyards B.V. Lemmer is currently building a large number of Bijlsma Traders 3250 and 4500 for Wagenborg Shipping B.V. and associated ship owners and captain-owners. The bodies with heavy-oil installation are built in the Czech Republic and China after which the vessels are completed at Lemmer.
Maersk Names New Efficiency Jack-up Rig No. 1
On 30 January Maersk Contractors named the latest addition to the fleet. The new high efficiency jack-up rig is the first in a series of four identical rigs currently under construction for Maersk Contractors. The following three highly advanced, next generation 350ft jack-up rigs will be delivered from Keppel FELS over the coming 15-20 months.
Construction Starts on New Ship for AIDA Cruises
On Friday 25 January 2008 Meyer Werft in Papenburg started the construction of the fourth club ship for the German cruise operator AIDA Cruises. Michael Ungerer, Member of the Board of AIDA Cruises (Rostock), pushed the button of the computer-controlled plasma torch to start the production of the first steel plate for the new ship.
Seatrials Bodewes Shipyards NB 780
NB 780 had its seatrials on the Eems on 22 January. Last year the hull of this vessel was towed from China to Hoogezand. Yesterday the completed ship was back in Delfzijl from where it left this morning for the technical seatrials.
Namegiving Ceremony of VOS Satisfaction
The namegiving ceremony for the VOS Satisfaction took place on Friday 18 January in Den Helder, the Netherlands. The vessel was christened by Mrs Monique Green-Sprengers, wife of Mr Rick Green, Regional Manager, DeepOcean B.V.
Boskalis Expands Coal Port of Newcastle
Royal Boskalis Westminster nv has acquired a large dredging contract for the expansion of the coal export harbor of Newcastle in Australia. The project will be executed in approximately 18 months until mid 2009. The contract value is approximately € 100 million, with the share of Boskalis being approximately € 50 million.
VNSI and HME Present Scheepsbouw Nederland
As of 1 January 2008 VNSI (Shipbuilding and -repair) and Holland Marine Equipment (maritime suppliers) have joined forces in looking after their members’ interests. The new organisation is called Scheepsbouw Nederland (shipbuilding Netherlands) and on 17 January 2008 the new combination was presented to business contacts and press at Slot Loevestein.














