Under commission by Chemgas Barging s.a.r.l. TeamCo Shipyard has begun the construction of two type G tankers to be delivered in the third quarter of 2018.

The tankers are 110 metres long and 11,37 metres wide with a depth of 2,70 metres. The ship design is from DST Entwicklungszentrum für Schiffstechnik und Transportsysteme e.V. and design outfit Ankerbeer BV te Foxhol.

The construction of the casco’s has been assigned to Kladovo Shipyard in Serbia (Gebroeders De Jonge).

 

Tunnel technology installation

The Van der Velden® FLEX Tunnel will be installed on these tankers as it has proven to reach up to 27% higher efficiency in comparison with similar ships using conventional tunnels. This technology reduces resistance under challenging sailing conditions which leads to better fuel utilisation and management.

The Van der Velden® FLEX Tunnel is activated only when the ship is empty or sailing in very shallow waters ensuring that there is sufficient water, free of air, being pumped to the screws. It has an airtight locking system which regulates the pressure and water level in the tunnel.