IHC IQIP has enabled Taiwan to install two monopiles as the foundations for its first offshore wind turbines.

Jiangsu Longyuan Zhenhua Marine Engineering Co. Ltd. was awarded the installation of the foundations for the Formosa project in Taiwan, where the offshore wind market is growing rapidly. IHC IQIP delivered a Hydrohammer S-2000 with 5.5 m pile sleeve to the company and provided analyses of soil conditions and pile dimensions.