CoCo Yachts and Afai Southern Shipyard have signed a contract for one Coastal Cruiser 199 and one Coastal Cruiser 300 with Peng Xing Shipping Company.

Peng Xing was the first to ever order a Coastal Cruiser 199 from CoCo Yachts. After having delivered the fifth Afai Southern Shipyard built Coastal Cruiser 199, Peng Xing Shipping Company has now ordered another one as well as a Coastal Cruiser 300, both with an option for one more.

The new aluminium high speed passenger ferries will be built at Afai Southern Shipyard in Guangzhou, and will have the following main particulars:

  Coastal Cruiser 199 Coastal Cruiser 300
Length over all 40.0 m 42.3 m
Beam over all 9.3 m 10.3 m
Depth at mid ship 3.4 m 3.4 m
Draft to baseline 1.2 m 1.3 m
Economy passengers capacity 159 @ 880 mm seat pitch 232 @ 880 mm seat pitch
Business passengers capacity 30 @ 1000 mm seat pitch 58 @ 1000 mm seat pitch
VIP capacity 10 10
Main engines 2x MTU 12V2000M72 2x MTU 16V2000M72
Installed power 2x 1080 kW 2x 1440 kW
Waterjets Rolls Royce S63-4 Rolls Royce S71-4
Speed @ full load @ 95% MCR 31.0 knots 28.5 knots

 

The Coastal Cruiser 199 will be delivered to Peng Xing Shipping Company in January 2017, whereas the Coastal Cruiser 300 will be ready for delivery April 2017. Both vessels shall be deployed to run services in the Pearl River delta between Shenzhen – Zhuhai – Hong Kong – Macau P.R. China.