Watch a 1m 30s time-lapse video of an LNG tanker docking at Damen Shiprepair Brest for repairs. This same yard has also been contracted for the repair of two CGM CMA container ships.
The Damen yard will perform the regular dry docking and special survey for two CMA CGM container vessels: Fort Ste Marie and Fort St Louis. An option for Fort St Pierre and Fort St Georges has also been discussed.