Greenship has signed a contract with Schelde Naval Shipbuilding for the delivery and supply of Sedinox Ballast Water Management Systems on board four navy patrol vessels for the Royal Dutch Navy. In addition, another two vessels owned by Chemgas Shipping, the Netherlands, will be equipped with Sediment Reduction Systems (Sedimentor).
Chemgas is very satisfied about the results of their first Sediment Reduction Systems that are already in operation. The Sedimentor is the first step in Greenship’s ballast water management system. Chemgas wants their new builds to be prepared for the pending IMO regulations.
Source: https://www.hme.nl/english/News/Greenship_received_orders_for_Ballast_Water_Management_Systems_and_Sediment_Reduction_Systems/Default.aspx?rId=400[HME]