(With video) Wintershall assumed the operatorship of a producing field in Norway for the first time in October 2013 when it took over the Brage platform. To mark the first anniversary, a film crew visited the platform in the Norwegian North Sea to get an exclusive look behind the scenes.

The Brage field is Wintershall Norge’s first operated production field. It is located east of Oseberg in the northern part of the North Sea, 125 kilometres west of Bergen. The water depth is 140 metres. The first oil on Brage was produced as early as 1993 and the field was then operated by Hydro. Statoil was operator from 2009 until Wintershall took over 1 October in 2013.

Brage is a fully integrated platform with living quarter,auxiliary equipment module, process modules, drilling modules, well and manifold areas. The cabin capacity is 130 people. It has been developed with a fixed integrated production, drilling and accommodation facility with a steel jacket. Gas lift is utilised in most wells, independent of formation. Brage has no storage capacity and the oil is therefore exported via the Oseberg Transport System (OTS) to the Sture terminal. The gas is exported via a pipeline to Kårstø.

Watch the film 'Brage – Unlocking the Full Potential' below.