IMO’s Marine Environment Protection Committee (MEPC) is currently in session to discuss the Polar Code and the implementation of the Ballast Water Management Convention.

The MEPC is in session from 13 to 17 October at IMO Headquarters in London.

Polar Code

The MEPC will review the environmental requirements under the proposed draft mandatory Polar Code, and the needed Marpol amendments to make it mandatory with a view to adoption at the next session (scheduled for May 2015).

The draft Polar Code covers the full range of design, construction, equipment, operational, training, search and rescue and environmental protection matters relevant to ships operating in waters surrounding the two poles. Draft environmental provisions include requirements covering prevention of pollution by oil, noxious liquid substances, sewage, and garbage. 

Ballast Water Management Status and Technologies

The MEPC will review the status of the Ballast Water Management (BWM) Convention. Once 35 per cent of the merchant fleet has ratified the convention (currently this is 30.25 per cent), it will enter into force twelve months later.

The Committee will consider a number of proposals aimed at supporting implementation of the BWM treaty. Draft guidelines for Port State Control under the BWM Convention will be considered with a view to adoption. The MEPC has been invited to decide on the parts of the draft guidelines related to sampling and indicative analysis for verifying (non-)compliance.

The MEPC is also expected to consider submissions related to a proposed resolution on measures to be taken to facilitate the BWM Convention’s entry into force as well as a draft plan and terms of reference for a proposed study on implementation of the ballast water standard described in regulation D-2 of the BWM Convention.

Proposed draft guidance on stripping operations using eductors will also be considered.

Meanwhile, further ballast water management systems that make use of active substances will be considered for Basic Approval (one system) and Final Approval (three systems).