(With extra pictures) In July Hydrex mobilised a team of diver/technicians to Syros, Greece, for a complex repair operation on a 118-metre, 8550 DWT chemical tanker.
The vessel had suffered large cracks in its hull plating as the result of a collision and was not allowed to sail any further. Hydrex proposed on-site repair using an open top cofferdam.
Vessel Collision
The tanker was berthed in Egypt when another vessel struck its portside hull. This caused a large hole, severe cracks and dented plating. The collision also pushed the vessel’s starboard side hard against the fenders, denting the plating on that side as well. Because it was fully laden, going into drydock was not feasible.
The ship was taken to the Neorion Syros Shipyards, situated on the island of Syros in Greece. When the ship arrived, the classification society decided the damage to the portside hull plating was too severe to let the tanker sail any further.
Open Top Cofferdam
There, Hydrex’ diver/technicians performed a permanent repair to the extensive damage to the portside plating. The less severe damage to the starboardside plating was temporarily repaired. This allowed the tanker to sail to Hamburg, unload its cargo and then quickly drydock for a permanent repair to the starboardside plating.
The damaged area on the portside was closed off with an open top cofferdam. This allowed the team to create a dry environment in which the shipyard could perform permanent repairs in drydock-like conditions. A custom cofferdam was designed by the Hydrex technical department, which was then constructed by the shipyard.
After the cofferdam was installed over the damaged hull plating, all water was removed from the inside. The yard then replaced the dented shell plating. The affected web frames were also replaced, using templates from the starboard side frames.
Difficult Cargo
‘The vessel was loaded with paraffin wax,’ says Mr. Andrew Anagnostis, Business Manager at Neorion Syros Shipyards. ‘So the cargo had to be kept in constant 70° C temperature to stay in a liquid state. In order to enable the yard to carry out the repair to the main damage in workable conditions, the crew of the vessel emptied the adjacent cargo tank.’
While the yard was performing the insert repair, the diver/technicians installed temporary stiffeners over the outside of the dented starboardside plating. ‘The reason they could not renew the damaged frames on this side was because the cargo could not be shifted,’ tells Mr. Anagnostis. ‘The temperature was around 70°C on the bulkhead and about 45-50°C in the other areas. So it was impossible for anybody to do any work, let alone weld.’
The repairs to both sides of the vessel were approved by the classification society. This allowed the vessel to sail to Germany.
Below a photo album with pictures of the repair operations above and underwater. Please click the pop-out link (the little squares at the bottom right) to view the pictures in their proper dimensions. All pictures by Hydrex.